Skip to content
Tavren
Controlling (CO)

What happens to KKE2 in SAP S/4HANA?

What changes at your desk

Changing base planning objects ends with the reference and simulation costing scope. KKE2 is removed, so switch to CKECP for quick estimates or CKUC for multilevel material costing.

ECC t-code Status Successor
KKE2 Deleted

SAP reference: S4TWL - Reference and Simulation Costing (S4TWL item 6.5.7, SAP Note 2349294)

Start with the free toolkit

See the format for yourself before you buy — the S/4HANA Readiness Starter Kit is free.

Get the free starter toolkit

Data: SAP S/4HANA t-code fate dataset v1.2.2 — github.com/Vasfqwfqqw/s4hana-tcode-dataset (CC BY 4.0).